September 2024 – Introduction Iron Bull Technology
Introduction of disruptive seabed pre-cutting and clearance technology
April 2024 – Pre-piling template – CDWE
Metrology, controls and hydraulics for a pre-piling template.
December 2023 – FPROV Yellowstone – Deme
Design and delivery of a state-of-the-art ROV with an integrated rotator, enabling unprecedented levels of workability.
February 2022 – Subsea Mining Equipment – Allseas
Engineering, manufacturing and qualification of the electronics, controls, and hydraulics for deep-sea mining vehicle.
November 2021 – Rock Installation Tool – Boskalis
Delivery of a highly advanced ROV designed for precision subsea rock installation.
November 2020 – Pre-piling template – Heerema
Metrology, controls, and hydraulics for a pre-piling template.
February 2020 – CT umbilical winch – van oord
Design and delivery of CT umbilical winch for 1800 kW subsea trenching vehicle.
May 2019 – Pre-piling template – GeoSea
Instrumentation, control system, and hydraulics for a pre-piling template.
December 2018 – Introduction Carrera E MFE spread
Seatools introduces game-changing Carrera E precision flow excavation spread.
October 2018 – Subsea mining vehicle equipment – GSR
Design and delivery of electronics, instrumentation, and hydraulics for pioneering subsea mining vehicle.
July 2018 – Remote Offshore Monitoring System – TOC
Design and delivery of offshore remote monitoring system for first-ever ocean cleanup system.
February 2018 – Anode Cage Installation AID – GeoSea
Design and delivery of tool that facilitates efficient installation of anode cages on monopiles.
March 2017 – Pile Installation Frame – Seaway Heavy Lifting
Instrumentation, control system, and hydraulics for pre-piling template PIF.
June 2016 – Fall pipe ROV 7 – Van Oord
Our latest fall pipe ROV with a highly redundant system architecture that achieves the highest possible redundancy levels.
May 2015 – FPSO mooring monitoring – BWO
Submerged monitoring system that facilitates reliable monitoring of FPSO anchor chain conditions.
April 2015 – FPROV simulator – Tree-C
Delivery of highly realistic FPROV simulator that facilitates effective operator training.
November 2014 – All-electric diamond wire subsea saw – 1Diamond
Advanced subsea diamond wire saw designed to cut anything in emergency situations.
May 2013 – Ultra-long lifetime prototype compensator – Siemens AS
Subsea pressure compensator with a MTTF of more than 20 years.
2012 – Two fall pipe ROVs – Jan de Nul
Delivery of two fall pipe ROVs for precision rock-dumping.
May 2012 – Subsea power pack – Boskalis
Delivery of rugged subsea power pack to control the relief valve on dredger suction tube.
August 2011 – “Rockpiper” FPROV – Boskalis
Delivery of highly innovative FPROV for precision rock-dumping executed with integrated survey ROV that facilitates vessel time reduction.
December 2010 – FPROV “Flintstone” – DEME
Delivery of fall pipe ROV “Flintstone” with integrated mass flow excavator.
May 2009 – FPROV “La Boudeuse” – Jan de Nul
Delivery of compact and mobile fall pipe ROV system “La Boudeuse”.
June 2008 – ROV 6 – Van Oord
Delivery of fall pipe ROV 6 for precision subsea rock installation.
November 2007 – Tunnel segment measurement system – Strukton
Developed and delivered a survey grade taut wire system that facilitates reliable immersed tunnel segment positioning operations.
April 2007 – Fall pipe ROV – Van Oord
Seatools delivers its first fall pipe ROV system to Van Oord: “ROV 5”.
August 2006 – Pipeline trencher “Arthropod 600” – MRTS
Innovative pipeline trencher that incorporates a high level of trenching automation.
March 2005 – OAS control system – Offshore solutions
Delivery of control system for the first successful heave-compensated gangway in the offshore industry.
October 2004 – Levelling sensor system – Heerema Marine Contractors
Delivery of highly accurate levelling system for the installation of an offshore compliant tower offshore West Africa.
October 2003 – ROCM – DCN
Delivery of a remotely operated cleaning machine for effective cleaning of power plant cooling water intakes.
April 2003 – DredgeMate®
Introduction of the highly successful DredgeMate® dredging visualisation systems.
September 2002 – Carrera 4 mass flow excavator – Oceanteam A/S
Delivery of innovative MFE tool with dedicated LARS that is capable of excavating various soil conditions.
August 2002 – ROHP II – Dutch North Sea Directorate
Seatools delivers its first inspection ROV: the multipurpose ROHP II.
November 2001 – Deep-water excavation grab – Deeprock
Delivery of a 400kW ROV that operates and positions a clamshell for a high-volume deep-water dredging.
August 2001 – Control and automation system for chain saw – Smit Salvage
Designed and built control and automation system for chain saw system in less than two months. System was deployed for salvage of the Russian submarine “Kursk.”
June 2000 – “Jetting Bull” cable trencher – Van Oord ACZ
June 2000 – First large contract signed: “Jetting Bull” cable trencher for Van Oord ACZ
August 1999 – Seatools founded
Seatools founded by a team of subsea engineering specialists.